Albania |
Wastewater Sanitation in Lezha and Shengjin
|
Environment |
Completed |
01 Mar 2012 |
Albania |
Project of Water Supply & Sewerage in Kamza
|
Environment |
Completed |
01 Feb 2011 |
Albania |
Upgrading of Kavaja Wastewater Treatment Plant and Completion of Sewerage Network for Golemi
|
Environment |
Completed |
01 May 2011 |
Bosnia and Herzegovina |
Reconstruction of Railway Section Sarajevo - Podlugovi on Corridor Vc
|
Transport |
Completed |
01 Aug 2013 |
North Macedonia |
Construction of OHL 400kV North Macedonia - Serbia
|
Energy |
Completed |
01 Dec 2010 |
Montenegro |
Berane Wastewater Treatment Plant
|
Environment |
Completed |
01 Jun 2010 |
Montenegro |
Pljevlja Centre for Elderly
|
Social |
Completed |
01 May 2013 |
Montenegro |
Reconstruction of Main Road Scepan Polje - Pluzine (Bosnia and Herzegovina Border )
|
Transport |
Completed |
01 Jun 2010 |
Serbia |
Municipal and Regional Infrastructure
|
Social |
Completed |
01 Feb 2011 |
Albania |
Feasibility Study for Construction of 220 kV Double Circuit Line Tirana 2 - Razhbull and New 220/110 kV Substation with 120 MVA Capacity in Rrogozhina
|
Energy |
Completed |
01 Dec 2010 |
Albania |
Feasibility Study and Detailed Design for Improvement of Flood Protection Infrastructure in Albania
|
Environment |
Completed |
01 May 2012 |
Bosnia and Herzegovina |
Water and Sanitation in Republika Srpska - 15 Municipalities
|
Environment |
Completed |
01 Jan 2014 |
Bosnia and Herzegovina |
Water and Sanitation Federation FBiH - 16 Municipalities
|
Environment |
Completed |
01 Sep 2013 |
Bosnia and Herzegovina |
Bijeljina Wastewater Treatment Plant Implementation
|
Environment |
Completed |
01 Oct 2012 |
Bosnia and Herzegovina |
Reconstruction of Distribution Networks in the Municipalities Connected to Plava Voda Regional Water Supply Project - 4 Municipalities
|
Environment |
Completed |
01 Feb 2014 |
Kosovo* |
Improvement of District Heating, Phase 2 - CHP
|
Energy |
Completed |
01 Apr 2011 |
Kosovo* |
Project Preparation Feasibility Studies for Wastewater Treatment Plants in Kosovo
|
Environment |
Completed |
01 Mar 2015 |
North Macedonia |
Health Provider Institutions (HPIs)
|
Social |
Completed |
01 May 2014 |
Montenegro |
Wastewater Treatment Plant and Network in Kolasin
|
Environment |
Completed |
01 Jul 2012 |
Montenegro |
Wastewater Treatment Plant and Network in Rozaje
|
Environment |
Completed |
01 Dec 2012 |
Montenegro |
Construction of Main Road Scepan Polje - Pluzine (Bosnia and Herzegovina Border)
|
Transport |
Completed |
01 Apr 2014 |
Serbia |
Municipal Water - Novi Sad Municipality
|
Environment |
Completed |
25 May 2017 |
Serbia |
Building the Knowledge Economy in Serbia, R&D Infrastructure Initiative / Teaching Infrastructure Investment Programme
|
Social |
Completed |
01 Oct 2010 |
Serbia |
Modernisation of Judiciary Facilities
|
Social |
Completed |
01 Mar 2012 |
Serbia |
Modernisation of Prison Facilities / Providing Humane and Safe Prison System
|
Social |
Completed |
01 Mar 2015 |
Serbia |
Social Housing Serbia
|
Social |
Completed |
01 Sep 2010 |
Albania |
Tirana University Hospital Centre Reform Programme in Albania - 2nd Phase
|
Social |
Completed |
01 Jul 2010 |
Albania |
Feasibility Study for Track Renewal, Signalling and Communication Systems in the Whole Network of Albanian Railway
|
Transport |
Completed |
01 Jun 2009 |
Albania |
Education, Excellence and Equity Project (EEE-P) and Rehabilitation of Tirana Schools – 2nd Phase
|
Social |
Completed |
01 Apr 2012 |
Albania |
Upgrade of Transmission System
|
Energy |
Completed |
01 Jun 2009 |
Bosnia and Herzegovina |
State Prison Project in Bosnia and Herzegovina
|
Social |
Completed |
01 Jun 2010 |
Bosnia and Herzegovina |
Plava Voda Regional Water Supply Project
|
Environment |
Completed |
01 Mar 2015 |
Bosnia and Herzegovina |
Construction of Main Road Foca (Brod na Drini) - Hum (Montenegro Border)
|
Transport |
Completed |
01 Dec 2012 |
Bosnia and Herzegovina |
Corridor Vc (Road) – Second Phase
|
Transport |
Completed |
01 Mar 2014 |
Kosovo* |
Regional Water Company Pristina
|
Environment |
Completed |
01 Feb 2010 |
Kosovo* |
Rehabilitation of Railway Route 10 (Leshak – Mitrovicë – Fushë Kosovë – Ferizaj – Hani i Elezit)
|
Transport |
Completed |
01 Nov 2010 |
North Macedonia |
Idrizovo Prison Reform Project in North Macedonia
|
Social |
Completed |
01 Nov 2013 |
North Macedonia |
Pilot Project – Windpark Development
|
Energy |
Completed |
01 Dec 2010 |
Montenegro |
Electricity Network Development Programme
|
Energy |
Completed |
01 Dec 2012 |
Montenegro |
Podgorica Water Infrastructure Project
|
Environment |
Completed |
01 Feb 2010 |
Montenegro |
Podgorica Wastewater Project
|
Environment |
Completed |
01 Feb 2010 |
Serbia |
Reconstruction of the Line Nis - Presevo - Macedonian Border
|
Transport |
Completed |
01 Jul 2010 |
Serbia |
Feasibility Study for Collection and Treatment of Wastewater in the Municipality of Vranje and Uzice
|
Environment |
Completed |
01 Jul 2010 |
Serbia |
Trans-Balkan Corridor: Upgrading to 400kV of the Transmission System in Western Serbia
|
Energy |
Completed |
01 Nov 2011 |
Albania |
Project Preparation, Feasibility Studies, Detailed Design and Supervision Services for construction/reconstruction of water supply systems in rural areas
|
Environment |
Completed |
31 Jul 2017 |
Kosovo* |
Gjakova District Heating Rehabilitation: Feasibility Study for Fuel Switching and System Expansion
|
Energy |
Completed |
11 Jan 2018 |
North Macedonia |
Water and Sewerage Programme
|
Environment |
Completed |
29 Sep 2020 |
Montenegro |
Gas Development Masterplan
|
Energy |
Completed |
05 Jun 2017 |
Montenegro |
Reliability and Safety Improvement of Bar - Vrbnica Railway Line (SEETO Rail Route 4)
|
Transport |
Completed |
29 Jun 2016 |
Montenegro |
Priority Bypass on the Montenegrin Coast
|
Transport |
Completed |
31 Dec 2017 |
Serbia |
Post-earthquake Housing Reconstruction in Kraljevo: Technical Advisory, Designs, Tender Documents
|
Social |
Completed |
16 Jan 2019 |
Serbia |
Construction of Highway E-80 (Merdare to Doljevac)
|
Transport |
Completed |
27 Sep 2015 |
Albania |
Gas Masterplan for Albania
|
Energy |
Completed |
17 May 2017 |
Kosovo* |
Comprehensive Network (Road 6b): Pre-feasibility Study, Preliminary Environmental and Social Impact Assessment, and Concept Design for Road N9 Pristina - Peja, Kijevë/Klina - Zahaq/Zahac Section
|
Transport |
Completed |
11 Jan 2018 |
Kosovo* |
Highway section E, Pristina - Merdare
|
Transport |
Completed |
31 Dec 2018 |
North Macedonia |
Corridor VIII: Beljakovce - Kriva Palanka Railway Section
|
Transport |
Active |
31 Dec 2026 |
Bosnia and Herzegovina |
Sava river basin flood management
|
Environment |
Completed |
29 Dec 2018 |
Croatia |
SEECEL implementation support
|
Social |
Completed |
03 Mar 2017 |
Serbia |
Judiciary Facilities - Kataniceva Building
|
Social |
Completed |
18 Nov 2016 |
Serbia |
Modernisation of Kragujevac and Pančevo Prison Facilities: Design Review, Tender Documents, and Procurement Assistance
|
Social |
Completed |
18 Apr 2018 |
Albania |
Detail design for 400 kV OHTL interconnection Elbasan-Bitola (Albanian part) including substation Elbasan 2 extension
|
Energy |
Completed |
12 May 2021 |
Bosnia and Herzegovina |
WATSAN Programme in Republika Srpska: Programme Management Support
|
Environment |
Completed |
19 Jun 2018 |
Bosnia and Herzegovina |
Preparation of Flood Hazard and Flood Risk Maps and Support to the PMU for Flood Risk Management
|
Environment |
Completed |
30 Nov 2020 |
Kosovo* |
Works Supervision for Rehabilitation of Railway Route 10 Phase 1: Section Fushe/Kosove – Border with North Macedonia
|
Transport |
Completed |
31 Jan 2023 |
North Macedonia |
Reconstruction of Penitentiary Institutions in North Macedonia
|
Social |
Completed |
09 Nov 2017 |
Montenegro |
Reconstruction of Scepan Polje - Pluzine Road: Detailed Design, Tender Documents, ESIA
|
Transport |
On Hold |
28 Feb 2023 |
Serbia |
Supervision of construction works and equipment of the new prison facilities in Pancevo and Kragujevac
|
Social |
Completed |
29 Jun 2023 |
Albania |
Feasibility Study for the Rehabilitation of Railway Line Durres - Pogradec - Lin and New Rail Line Link to Border with North Macedonia
|
Transport |
Completed |
07 Dec 2018 |
North Macedonia |
Preparation of the technical documentation for the construction of the Railway Joint Border Station between North Macedonia and Serbia
|
Transport |
Completed |
06 Dec 2018 |
Montenegro |
Special Inspection of 106 tunnels and Development of the Main Designs for their Rehabilitation
|
Transport |
Completed |
07 Oct 2020 |
Bosnia and Herzegovina |
Technical documentation Preparation and TSO support for 400 kV Interconnection Serbia – Montenegro – Bosnia and Hercegovina - Regional Project
|
Energy |
Completed |
14 Nov 2022 |
Albania |
Strengthening the Capacity of the Public Sector to Undertake PPPs in the Western Balkans
|
PrivateSectorDevelopment |
Completed |
27 Jun 2019 |
Serbia |
Preparation of technical documentation for the major Batajnica sewerage system facilities with WWTP
|
Environment |
Active |
31 Dec 2025 |
Serbia |
Preliminary Design and Feasibility Study with ESIA for Construction of Highway E-80
|
Transport |
Completed |
31 Dec 2018 |
Bosnia and Herzegovina |
Support to the Construction of a Maximum Security State Prison
|
Social |
Completed |
31 Dec 2020 |
Bosnia and Herzegovina |
Medical Faculty, Research Centre and School
|
Social |
Completed |
31 Dec 2018 |
Kosovo* |
Lepenc Canal Feasibility Study
|
Environment |
Completed |
31 Dec 2020 |
Kosovo* |
Preliminary Design and ESIA for Fushe Kosova/Kosovo Polje – Podujevo Railway Line
|
Transport |
Completed |
23 Mar 2022 |
Kosovo* |
Orient/East-Med Corridor: Detailed Technical Project Design and Tender Preparation for Fushe Kosove/Kosovo Polje - Mitrovica Railway Line on Route 10
|
Transport |
Active |
31 Dec 2024 |
Montenegro |
Orient/East-Med Corridor: Reliability and Safety Improvements on Bar - Vrbnica Railway Line Phase 2 (Concrete Bridges)
|
Transport |
Completed |
29 Mar 2020 |
Bosnia and Herzegovina |
Technical Assistance for South East European Regional Security Coordination Initiative (SEE RSCI)
|
Energy |
Completed |
29 Apr 2020 |
Albania |
Adriatic-Ionian Highway/Expressway: Feasibility Study
|
Transport |
Completed |
28 Sep 2019 |
Serbia |
Technical documentation Preparation and TSO support for 400 kV OHL Obrenovac – Bajina Basta
|
Energy |
Completed |
17 Oct 2022 |
Serbia |
Orient/East-Med Corridor (R10) Reconstruction and modernisation section Stalac-Krajlevo-Rudnica
|
Transport |
Completed |
29 Sep 2020 |
Kosovo* |
Detailed Design and Tender Preparation for the Northern Part of Railway Route 10 (Mitrovica - Lesak - Border with Serbia)
|
Transport |
On Hold |
30 Jun 2025 |
North Macedonia |
Modernisation of Tabanovce - Gevgelija Railway Line: ETCS Level 1 for Rail Corridor X and Improvement of Signalling Along the Macedonian Railway Network
|
Transport |
Completed |
29 Jun 2020 |
North Macedonia |
Preparation of Pre-feasibility Study for Railway Line Skopje - Kicevo as Central Part of Rail Corridor VIII
|
Transport |
Completed |
29 Jun 2020 |
North Macedonia |
Modernisation of Tabanovce - Gevgelija Railway Line: Installation of GSMR Along Corridor X
|
Transport |
Completed |
29 Jun 2020 |
Montenegro |
Montenegro Wastewater and Water Supply Projects: Technical Assistance in Preparation of Project Documentation
|
Environment |
Completed |
31 Dec 2020 |
Montenegro |
Montenegro Wastewater and Water Supply Projects - Technical Assistance in Project Implementation - Supervision of Works for Podgorica WWTP Design and Build
|
Environment |
Active |
30 Dec 2027 |
Albania |
Preliminary Design of the Ionian Adriatic Gas Pipeline - Montenegro and Albania Sections
|
Energy |
Completed |
26 Aug 2021 |
Albania |
Regional Energy Efficiency Programme for the Western Balkans - REEP Plus
|
Energy |
Completed |
31 Dec 2021 |
Albania |
Prefeasibility Study for Albania - Kosovo Gas Pipeline
|
Energy |
Completed |
31 Dec 2018 |
Serbia |
High Education Infrastructure
|
Social |
Active |
27 Dec 2024 |
Serbia |
Preliminary Design and Feasibility Study with ESIA for Contruction of Highway E-80 in Serbia (SEETO Route 7): from Kosovo* (administrative crossing Merdare) to Plocnik
|
Transport |
Completed |
31 Dec 2020 |
Albania |
Detailed design for rehabilitation of railway line Vorë - Han i Hotit
|
Transport |
Completed |
18 Apr 2021 |
Albania |
Detailed design for the Tirana bypass (Kashar-Vaqarr-Mullet)
|
Transport |
Completed |
28 Dec 2021 |
Kosovo* |
N9 Prishtinë - Pejë (SEETO Route 6 B) section from Kijevë - Klina to Zahaq (30 Km)
|
Transport |
Completed |
31 Dec 2020 |
Montenegro |
Rehabilitation of Vrbnica - Bar Railway Line in Montenegro along the Main Belgrade - Bar Railway (Rail Route 4)
|
Transport |
Completed |
29 Sep 2020 |
Serbia |
Preparation of the Design for the building permit for modernization of the railway line Niš – Dimitrovgrad and preparation of the tender documents.
|
Transport |
Completed |
06 Jun 2023 |
Albania |
Skavica Hydropower Plant: Feasibility Study and ESIA
|
Energy |
Completed |
31 Dec 2020 |
Albania |
Shkodra/Skadar Lake Area, Villages of Shiroka and Zogaj, Water Supply and Sewage Systems and Improvement of Waste Management: Feasibility Study & ESIA
|
Environment |
Completed |
31 Aug 2020 |
Albania |
Durres Port, Reconstruction of Quays 1 & 2: Pre-feasibility Study, Feasibility Study, ESIA, Review and Update of Detailed Design and Tender Documentation
|
Transport |
Completed |
29 Mar 2022 |
Bosnia and Herzegovina |
WATSAN Programme in the Federation of Bosnia and Herzegovina: Extended TA Support for the Implementation and Management of the Project
|
Environment |
Completed |
30 Sep 2021 |
Bosnia and Herzegovina |
Corridor Vc, Construction of Motorway Section Svilaj - Odzak, Border Crossing and Interstate Bridge on the Sava River: Financial Management and Monitoring of the Project
|
Transport |
Completed |
05 Feb 2021 |
Kosovo* |
Upgrading the Physical Infrastructure of Secondary and Tertiary Healthcare Institutions: Feasibility Study, Tender Documents
|
Social |
Completed |
13 Mar 2019 |
Kosovo* |
Pristina Intermodal Terminal: General Rehabilitation and Construction of Railway Line Pristina - Pristina Airport "Adem Jashari": Feasibility Study and ESIA
|
Transport |
Completed |
23 Nov 2021 |
North Macedonia |
Reconstruction of Penitentiary Institutions: Extended TA Support for the Implementation and Management of the Project
|
Social |
Completed |
31 Oct 2020 |
Montenegro |
Orient/East-Med Corridor, SEETO Route 4, Railway Line Vrbnica – Bar, Replacement of the Signal - Safety System in the Northern Part: Connection to Central Command and Main Design for the Rehabilitation of Landslide Ratac
|
Transport |
Completed |
27 Jun 2021 |
Montenegro |
Orient/East-Med Corridor, SEETO Route 4, Bar - Boljare Highway, Matesevo – Andrijevica Section: Preliminary Design and ESIA
|
Transport |
Completed |
05 Dec 2022 |
Montenegro |
Orient/East-Med Corridor, SEETO Route 4, Bar - Boljare Highway, Podgorica Bypass: Preliminary Design and ESIA
|
Transport |
Active |
28 Jun 2020 |
Albania |
Regional Study for Voltage Profile Improvement: Feasibility Study
|
Energy |
Completed |
31 Jan 2021 |
Serbia |
Energy Efficiency in Public Buildings - Education Facilities: Extended TA Support for the Implementation and Management of the Project
|
Energy |
Active |
31 Jan 2027 |
Albania |
Albania, Water Sector Performance and Investment Programme/Municipal Infrastructure V: Feasibility Studies, Preliminary Designs
|
Environment |
Completed |
30 Apr 2022 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, WATSAN Programme in Republika Srpska: Project Appraisals, Feasibility Studies, Tender Dossiers
|
Environment |
Completed |
29 Feb 2024 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Regional Sanitary Landfill for Zivinice, Banovici and Kladanj: Supervision of Works
|
Environment |
Active |
31 Jul 2024 |
Bosnia and Herzegovina |
Mediterranean Corridor (Road CVc), Construction of Konjic (Ovčari) - Mostar North Motorway Section, Subsection Konjic (Ovčari) - Entrance to Tunnel Prenj: Preliminary Design, Detailed Design, Tender Documentation
|
Transport |
Active |
30 May 2025 |
Bosnia and Herzegovina |
Mediterranean Corridor (Road CVc), Construction of Tarčin - Konjic Motorway Section, Subsection Ivan - Ovčari: Feasibility Study, ESIA, Detailed Design
|
Transport |
Active |
31 Aug 2025 |
Kosovo* |
Kosovo, River Basins Drini i Bardhe, Lepenc and Sitnica: Preliminary Flood Risk Assessment
|
Environment |
Completed |
22 Feb 2021 |
Kosovo* |
Comprehensive Network (Road R6b), Construction of N9 Pristinë - Pejë Highway, Section Kijevë/Klina - Zahaq/Zahac: Detailed Design
|
Transport |
Completed |
25 Apr 2019 |
North Macedonia |
Orient/East-Med Corridor (Road R6a), Construction of A4 Skopje - Blace Motorway, Section Interchange Stenkovec - Blace: Detailed Design, ESIA, Tender Documentation
|
Transport |
Completed |
30 Nov 2022 |
Montenegro |
Mediterranean Corridor (Road R1), Adriatic-Ionian Highway, Construction of Budva Bypass: Preliminary Design
|
Transport |
Completed |
05 Jun 2023 |
Montenegro |
Orient/East-Med Corridor, Road R4, Construction of Bar - Boljare Highway: Feasibility Study with Cost-Benefit Analysis
|
Transport |
Completed |
02 Dec 2022 |
Serbia |
Serbia, Water Supply and Wastewater Treatment in Medium-sized Municipalities VI: Feasibility Studies, Environmental Impact Assessments, Detailed Designs, Tender Dossiers
|
Environment |
Completed |
31 Aug 2023 |
Serbia |
Serbia, West Morava and Tamiš Sub-river Basins, Infrastructure Programme for Integrated Water Management: Pre-feasibility Studies, Conceptual Designs
|
Environment |
Completed |
27 Aug 2021 |
Serbia |
Orient/East-Med Corridor (Road R7), Construction of Niš - Merdare Highway, Section Niš (Merošina) - Pločnik (Beloljin): Detailed Design
|
Transport |
Completed |
27 Nov 2021 |
Albania |
Albania, Regional Broadband Infrastructure Development: Feasibility Study
|
DigitalInfrastructure |
Completed |
04 Sep 2020 |
Albania |
Albania, Mati River Flood Protection Infrastructure: ESIA, Detailed Design, Tender Dossier
|
Environment |
Completed |
25 May 2021 |
Albania |
Albania, Water Supply and Sewerage Systems in Himara Municipality and Its Coastal Villages: Detailed Design, Tender Dossier
|
Environment |
Completed |
30 Jun 2022 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Flood Risk Management Project: Preparation of Flood Hazard and Flood Risk Maps Phase II
|
Environment |
Completed |
30 Nov 2020 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Flood Risk Management Project: Continuation of Procurement Assistance for the Flood Risk Management Project in Republika Srpska
|
Environment |
Completed |
27 Apr 2023 |
Bosnia and Herzegovina |
Mediterranean Corridor, Bosnia and Herzegovina - Croatia CVc Road Interconnection, Počitelj - Zvirovići Subsection: Supervision of Works
|
Transport |
Active |
11 Aug 2025 |
Kosovo* |
Orient/East-Med Corridor, Kosovo - Serbia R7 Road Interconnection, Pristina - Merdare Section: Tender Dossier, Supervision of Works
|
Transport |
Active |
31 Dec 2024 |
North Macedonia |
North Macedonia, Skopje Wastewater Treatment Plant: Project Implementation Consultant
|
Environment |
Completed |
31 Dec 2021 |
Montenegro |
Mediterranean Corridor, Montenegro - Croatia - Albania R1 Road Interconnection, Budva Bypass: Preliminary Design, ESIA
|
Transport |
Completed |
05 Jun 2023 |
Serbia |
Orient/East-Med Corridor, Serbia - Bulgaria CXc Rail Interconnection, Niš Bypass: Design for Building Permit, Tender Dossier
|
Transport |
Completed |
06 Jun 2023 |
Serbia |
Orient/East-Med Corridor, Serbia - North Macedonia CX Rail Interconnection, Niš - Preševo - Border Between the Two States Section: Feasibility Study, ESIA, Preliminary Design, Tender Dossier
|
Transport |
Active |
10 Jun 2025 |
Albania |
Regional and Local Roads
|
Transport |
Completed |
31 Dec 2016 |
Bosnia and Herzegovina |
Corridor Vc Motorway
|
Transport |
Completed |
31 Jan 2014 |
Bosnia and Herzegovina |
Mahovljani Interchange: Assistance with Institutional Strengthening of RS Motorways
|
Transport |
Completed |
13 Sep 2011 |
Serbia |
Corridor X Serbia
|
Transport |
Completed |
31 Dec 2015 |
Albania |
Albania, Dumrea Underground Natural Gas Storage: Feasibility Study, ESIA
|
Energy |
Completed |
24 Nov 2021 |
Albania |
Albania, Fier – Vlora Gas Transmission Pipeline: Detailed Design, Tender Dossier
|
Energy |
Completed |
14 Oct 2022 |
Albania |
Albania, Flood Protection Infrastructure on Erzen-Ishem, Shkumbin, Seman and Vjosa Rivers: Feasibility Study, ESIA
|
Environment |
Active |
29 Jan 2025 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Banja Luka Medical Faculty, Centre for Education & Research, Faculty of Healthcare and Secondary Medical School: Feasibility Study, EIA, Preliminary Design, Detailed Design for Infrastructure and Utility Networks, Auxiliary Facilities
|
Social |
Completed |
12 Apr 2022 |
Bosnia and Herzegovina |
Mediterranean Corridor, Bosnia and Herzegovina – Croatia CVc Road Interconnection, Exit Prenj Tunnel – Mostar North Subsection: Preliminary Design, Detailed Design, ESIA
|
Transport |
Active |
31 Jan 2025 |
Kosovo* |
Kosovo, Mitrovica and Gjilan Wastewater Treatment Plants: Tender Dossier, PIU Support
|
Environment |
Active |
30 Jun 2026 |
North Macedonia |
North Macedonia, Optimisation of the Energy Utilisation of the Crna Reka: ESIA, Feasibility Study
|
Energy |
Completed |
31 May 2024 |
Montenegro |
Montenegro, Mojkovac Prison: Feasibility Study Review, Preliminary Design, EIA, Detailed Design, Tender Dossier
|
Social |
Completed |
30 Nov 2022 |
Montenegro |
Mediterranean Corridor, Montenegro – Albania R2 Rail Interconnection, Podgorica – Border Between the Two States Section: Feasibility Study, Conceptual Design, ESIA, PIU Support
|
Transport |
Completed |
03 Apr 2023 |
Serbia |
Rhine-Danube Corridor, Belgrade Port: Pre-feasibility Study, Conceptual Design
|
Transport |
Completed |
15 Nov 2022 |
Serbia |
Mediterranean Corridor, Serbia – Croatia CX Rail Interconnection, Belgrade – Šid –Border Between the Two States Section: Feasibility Study, Preliminary Design, ESIA
|
Transport |
Active |
29 Jun 2025 |
Albania |
Albania, Elbasan Functional Waste Area: Feasibility Study, ESIA, PIU Support
|
Environment |
Completed |
28 Oct 2022 |
Albania |
Albania, Fier Functional Waste Area: Feasibility Study, ESIA, PIU Support
|
Environment |
Completed |
28 Oct 2022 |
Albania |
Albania, Water Supply and Sewerage Systems in Himara Municipality and Its Coastal Villages: Supervision of Works
|
Environment |
Active |
30 Mar 2026 |
Albania |
Comprehensive Network, Corridor VIII, Durres – Rrogozhine Railway Section: Detailed Design, Tender Dossier
|
Transport |
Completed |
07 Mar 2022 |
Kosovo* |
Kosovo, District Heating Systems: Feasibility Study, ESIA
|
Energy |
Completed |
21 Jul 2024 |
Kosovo* |
Kosovo, Gas Development Plan and Regulatory Framework Review and Assistance
|
Energy |
Completed |
08 Nov 2023 |
Kosovo* |
Kosovo, Development of a Construction and Demolition Waste (CDW) Management Plan for Kosovo
|
Environment |
Completed |
16 Jun 2023 |
Kosovo* |
Kosovo, Construction of the Kremenate Dam: Detailed Design Update, Tender Dossier
|
Environment |
Active |
30 Jun 2026 |
Kosovo* |
Kosovo, Sewage and Rainwater Network for Pristina Agglomeration: Feasibility Study/Masterplan
|
Environment |
Completed |
30 Jun 2022 |
Kosovo* |
Kosovo, Construction and Rehabilitation of Healthcare Infrastructure: Feasibility Study, Conceptual Design, Other
|
Social |
Active |
22 Jul 2025 |
North Macedonia |
North Macedonia, North Macedonia – Kosovo Gas Interconnection: Feasibility Study, ESIA Scoping
|
Energy |
Completed |
30 Aug 2023 |
North Macedonia |
North Macedonia, Strengthening the Transmission Network in the Southeast Region of North Macedonia: Feasibility Study, ESIA, Preliminary Design, Tender Dossier
|
Energy |
Active |
10 Aug 2024 |
Montenegro |
Montenegro, Broadband Infrastructure Development: National Broadband Development Plan, PIU Support
|
DigitalInfrastructure |
Completed |
09 Dec 2021 |
Montenegro |
Orient/East-Med Corridor, Route 4, Golubovci – Bar Section of the Bar – Vrbnica Railway Line: ESIA, Preliminary Design, Detailed Design, PIU Support, Other
|
Transport |
Active |
29 Jun 2025 |
Albania |
REEP Plus, Window 4 - Public Buildings: Nearly Zero-Energy Buildings
|
Energy |
Active |
31 Dec 2026 |
Serbia |
Serbia, North CSE Corridor, New 400/110 kV 2x300 MVA Belgrade West Substation and OHL 400 kV Serbia – Romania: Pre-feasibility Study, ESIA
|
Energy |
Completed |
27 Aug 2021 |
Serbia |
Serbia, Energy Efficiency Renovation Programme of Central Government Buildings: PIU Support
|
Energy |
Completed |
27 Sep 2023 |
Serbia |
Serbia, Construction of the Struganik Dam: Feasibility Study, ESIA, Preliminary Design
|
Environment |
Active |
30 Mar 2026 |
Serbia |
Serbia, Flood Risk Management Programme for Central Serbia: Flood Risk Management Plan, Strategic Environmental Assessment
|
Environment |
Completed |
30 May 2024 |
Serbia |
Orient/East-Med Corridor, Belgrade Marshalling Yard – Ostruznica – Batajnica Railway Line: Feasibility Study, ESIA, Preliminary Design, Tender Documents
|
Transport |
Active |
31 Oct 2025 |
Kosovo* |
Kosovo, Connecting Primary and Secondary Schools in Kosovo: Feasibility Study and Cost-Benefit Analysis
|
DigitalInfrastructure |
Completed |
17 Jan 2023 |
Albania |
Balkans Digital Highway: Feasibility Study and Cost Benefit Analysis, Preliminary Design
|
DigitalInfrastructure |
Completed |
30 Dec 2023 |
Serbia |
Serbia, Next Generation Broadband Connectivity for Rural Schools in White Zones: Fixed Broadband Mapping, Feasibility Study and Cost-Benefit Analysis, Conceptual Designs, ESIA, Preliminary Designs
|
DigitalInfrastructure |
Completed |
30 Apr 2022 |
Albania |
Albania, Development of a Broadband Atlas for Albania: Pre-feasibility Study
|
DigitalInfrastructure |
Completed |
16 Nov 2022 |
Albania |
Albania, Smart Cities – Smart Villages: Conceptual Design, Feasibility Study and ESIA for Three Pilot Cities
|
DigitalInfrastructure |
Active |
30 Sep 2025 |
Albania |
Albania, Regional HPC Infrastructure, Interconnection of Regional University Campuses via WB NREN to the Infrastructure and Upgraded HPC-hosting Data Centre: Pre-feasibility Study, Needs Assessment
|
DigitalInfrastructure |
Completed |
28 Feb 2023 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Sarajevo Water Project: Technical Assistance for Supervision of Works Financed by Tranche 2 Loan
|
Environment |
Active |
31 Mar 2027 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Housing and Social Integration of Vulnerable Persons Living in Collective Accommodation: Technical Assistance for Project Implementation, Management and Coordination
|
Social |
Active |
31 Dec 2024 |
Serbia |
Development and Implementation of Integral Torrential Floods and Erosion Protection Measures, Works and Structures Based on a Green Solution in Krupanj Pilot Area, Likodra River Basin
|
Environment |
Active |
28 Apr 2026 |
Serbia |
Serbia, Greening the Public Sector - Rehabilitation of the VMA Hospital: Technical Assistance for Project Preparation and Implementation
|
Social |
Active |
30 Jun 2026 |
Albania |
Albania, Broadband Development in White Areas in Shkodra, Kukes, Dibra, Vlora, Gjirokastra, Fier, Berat, Korçë: Feasibility Study Update, Tender Documents
|
DigitalInfrastructure |
Active |
31 Oct 2024 |
Albania |
Mediterranean Corridor, Murriqan – Lezhë Route 2b Highway Section: Preliminary Design, ESIA
|
Transport |
Active |
21 Jun 2024 |
Kosovo* |
Kosovo, Water Supply Improvement and Water Resources Protection for Gjakova Regional Water Company: Feasibility Study, ESIA, Detailed Design, Tender Dossier
|
Environment |
Completed |
21 Jun 2023 |
Montenegro |
Montenegro, Pljevlja Sewerage Network Phase 2: Feasibility Study, Detailed Design, Tender Documentation
|
Environment |
Active |
30 Dec 2024 |
Montenegro |
Montenegro, Ulcinj Wastewater Treatment Plant and Related Infrastructure: Feasibility Study Update, ESIA, Designs, Tender Documents, PIU Support
|
Environment |
Active |
13 Jun 2025 |
Montenegro |
Orient/East-Med Corridor, Bar – Vrbnica Route 4 Railway Line: Feasibility Study, ESIA, Preliminary Design, Tender Documents for Power Supply and Video Surveillance
|
Transport |
Active |
31 Mar 2024 |
Serbia |
Serbia, New Campus for the Electrical Engineering and Technical Faculties in Belgrade: Feasibility Study, ESIA, Preliminary Design
|
Social |
Completed |
07 Dec 2022 |
Serbia |
Orient/East-Med Corridor, Kraljevo – Rudnica Route 10 Railway Section: Feasibility Study, ESIA, Preliminary Design, Tender Documents
|
Transport |
Active |
30 Jul 2025 |
Serbia |
Orient/East-Med Corridor, Pločnik – Merdare Route 7 Highway Section: Detailed Design, Tender Documents
|
Transport |
On Hold |
01 Nov 2023 |
Albania |
Albania, Durrës Wastewater Management Project: Feasibility Study, Preliminary Design, ESIA
|
Environment |
Active |
25 Mar 2024 |
Kosovo* |
Kosovo, Iber-Lepenc Hydro System Project Phase 1: Preliminary Design, ESIA
|
Environment |
Active |
01 Jun 2025 |
Kosovo* |
Kosovo, Flood Risk Maps and Flood Hazard Maps for All River Basins in Kosovo
|
Environment |
Active |
27 Feb 2024 |
North Macedonia |
North Macedonia, North Macedonia - Serbia Gas Interconnection: Feasibility Study, ESIA
|
Energy |
Active |
12 Mar 2025 |
Serbia |
Serbia, North Continental South East Corridor: Feasibility Study, ESIA
|
Energy |
Completed |
01 Dec 2022 |
Serbia |
Orient/East-Med Corridor, Stalać – Kraljevo Route 11 Railway Section: Feasibility Study, ESIA, Preliminary Design, Tender Documents
|
Transport |
Active |
01 Dec 2025 |
Albania |
Albania, High Performance Computing for Government Data and Secure Information Exchange Network for Regional Interoperability in the Western Balkans: Feasibility Study
|
DigitalInfrastructure |
Active |
23 Dec 2025 |
Albania |
Albania, Assessment and Evaluation of Dam Safety and Potential of Existing Reservoirs to Improve Irrigation to Enhance Resilience to Climate Change: Pre-feasibility Study
|
Environment |
Active |
01 Jan 2026 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Secondary Sewerage Network for Mostar City: Feasibility Study Update, ESIA, Detailed Design, Tender Dossiers
|
Environment |
Active |
13 Mar 2025 |
Kosovo* |
Kosovo, Development of Financial Models for KEEF for Investments in Energy Efficiency Measures for Residential Buildings and SME: Gap Analysis/Roadmap
|
Energy |
Completed |
12 Apr 2024 |
Albania |
Albania, Expansion of the Government Network (GovNet) to Ensure Faster, Reliable and Secure Communication Between Healthcare Service Providers: Feasibility Study
|
DigitalInfrastructure |
Active |
01 Apr 2024 |
Albania |
Albania, Fierza – Koman Pump Storage Plant: Feasibility Study, ESIA, Preliminary Design
|
Energy |
Active |
30 Jun 2025 |
Albania |
Albania, Energy Efficient Schools Buildings in Albania (EnE4Schools): Technical Assistance for Project Preparation
|
Energy |
Active |
30 May 2025 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Water and Sanitation Services Modernisation Project: Technical Support to Strengthen Capacities for Securing Efficient Water and Sanitation Services
|
Environment |
Active |
31 Dec 2026 |
Bosnia and Herzegovina |
Corridor Vc, Prenj Tunnel Motorway Subsection in Bosnia and Herzegovina: Technical Assistance for Project Implementation Support
|
Transport |
Active |
31 Jul 2031 |
North Macedonia |
North Macedonia, Regional Waste Management System in Vardar and Southeast Region: Technical Assistance for Assessment of Regional Waste Management System Development
|
Environment |
Active |
29 Jun 2026 |
Montenegro |
Montenegro, Broadband Infrastructure Development: Technical Documentation Update, Tender Documents, Environmental and Social Action Plan
|
DigitalInfrastructure |
Active |
30 Dec 2029 |
Montenegro |
Montenegro, Niksic Wastewater Management System, Sewerage Network Phase 2: Feasibility Study and Cost-Benefit Analysis, Detailed Design with E(S)IA, Tender Documents
|
Environment |
Active |
31 Oct 2024 |
Kosovo* |
Kosovo, Technical Assistance for Preparation of an Adequate Social Housing Programme Phase 1
|
Social |
Active |
06 Dec 2025 |
Montenegro |
Montenegro, Bar – Boljare Highway: Update of the Bar – Boljare Highway Feasibility Study and Detailed Design, Tender Documents for Matesevo – Andrijevica or Smokovac – Farmaci Section
|
Transport |
Active |
31 Jul 2025 |
Serbia |
Serbia, Kolubara A Photovoltaic Power Plant: Development of Investment-Technical Documentation (Pre-feasibility Study with General Design, Feasibility Study, ESIA, Tender Dossiers, Procurement Procedures)
|
Energy |
Active |
29 Jun 2024 |
Serbia |
Serbia, Morava Photovoltaic Power Plant: Development of Investment-Technical Documentation (Pre-feasibility Study with General Design, Feasibility Study, ESIA, Tender Dossiers, Procurement Procedures)
|
Energy |
Active |
29 Jun 2024 |
Serbia |
Serbia, Solar Thermal and Heat Pump Generated Renewable Energy Integration in Novi Sad District Heating System
|
Energy |
Active |
31 Oct 2024 |
Albania |
Albania, New 400 kV OHTL Fier (Albania) – Arachtos (Greece): Feasibility Study, ESIA
|
Energy |
Active |
22 Jan 2026 |
Albania |
Albania, Offshore Wind Power Plant: Conceptual Design, Feasibility Study, ESIA
|
Energy |
Active |
31 Dec 2030 |
Albania |
Albania, Integrated National Sanitation Strategy & Investment Planning, Regional Masterplan for Tirana Region
|
Environment |
Active |
06 Sep 2025 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Implementation of a Pilot Sustainable Waste Management System in Central Bosnia: Feasibility Study, ESIA
|
Environment |
Active |
01 Oct 2025 |
Montenegro |
Montenegro, 400 kV Interconnection OHL Brezna – Crkvičko Polje – Sarajevo: Feasibility Study, ESIA
|
Energy |
Active |
24 Nov 2025 |
Montenegro |
Montenegro – Serbia Rail Interconnection, Bar – Vrbnica Section, Sozina Tunnel: Detailed Design, ESIA, Tender Dossier
|
Transport |
Active |
01 Sep 2026 |
Montenegro |
Montenegro – Albania Rail Interconnection, Podgorica – Border Between the Two States Section: Detailed Design, ESIA, Tender Dossier
|
Transport |
Active |
29 Sep 2025 |
Serbia |
Serbia, Central-Balkan Corridor: Pre-feasibility Study, SEA
|
Energy |
Active |
18 Apr 2025 |
Albania |
Albania, Wastewater Network and Treatment Plant Rehabilitation and Extension in Durrës City: Detailed Design, Tender Documents
|
Environment |
Active |
31 Dec 2025 |
Albania |
Albania, Adriatic-Ionian Corridor, Murriqan – Lezhë Highway Section: Detailed Design, ESIA Update, Tender Documents
|
Transport |
Active |
29 Jan 2027 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Core Broadband Infrastructure Development: Pre-feasibility Study
|
DigitalInfrastructure |
Active |
29 Aug 2025 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Reconstruction and Rehabilitation of Water Supply and Wastewater Systems in Zivinice Agglomeration: Detailed Design, Tender Documents
|
Environment |
Active |
31 Dec 2025 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Plava Voda Regional Water Supply System: Feasibility Study, ESIA, Preliminary Design and Detailed Design Update, Tender Documents
|
Environment |
Active |
29 Aug 2025 |
Bosnia and Herzegovina |
Bosnia and Herzegovina, Banja Luka Medical Complex Project Phase 3: Feasibility Study
|
Social |
Active |
30 Sep 2025 |
North Macedonia |
North Macedonia, Rail Corridor VIII, Struga (North Macedonia) – Lin (Albania) Section: Pre-feasibility Study
|
Transport |
Active |
18 Dec 2025 |
North Macedonia |
North Macedonia, Rail Corridor X Track Renewal and Reconstruction: Pre-feasibility Study, Feasibility Study, ESIA, Preliminary Design
|
Transport |
Active |
18 Dec 2026 |
Montenegro |
Montenegro, New 110 kV OHL Virpazar – Briska Gora – Ulcinj with Extension of 110/35 kV Virpazar and 110/35 kV Ulcinj Substations: Feasibility Study, ESIA
|
Energy |
Active |
30 Jan 2026 |
Serbia |
Serbia, Closure and Rehabilitation of Municipal Unsanitary Landfills and Construction of Recycling Yards in Novi Sad Waste Management Region: Conceptual Designs, Preliminary Designs, EIAs
|
Environment |
Active |
30 Apr 2026 |
Albania |
Feasibility Study for Construction of New Substation 220/110 kV in Tirana 3 (Sauk Area) with 120 MVA Capacity and Reinforcement 110 kV Tirana Ring
|
Energy |
Completed |
01 Dec 2011 |
Albania |
TA for Project Implementation Roads Sector
|
Transport |
Completed |
31 Dec 2015 |
Albania |
Detailed Design for Tirana-Durres Railway Section and economic financial appraisal for whole rail network
|
Transport |
Completed |
31 Dec 2017 |
Bosnia and Herzegovina |
Support to the Construction of a Maximum Security State Prison
|
Social |
Completed |
01 Apr 2011 |
North Macedonia |
Feasibility Study and ESIA for the Electricity Production and Irrigation Components of the Zletovica Project
|
Energy |
Completed |
31 Dec 2017 |
North Macedonia |
Albania - North Macedonia 400 kV Interconnection
|
Energy |
Completed |
01 May 2013 |
Serbia |
Rehabilitation of District Heating Systems in Serbia – Phase IV
|
Energy |
Completed |
31 Dec 2016 |
Kosovo* |
Energy Efficiency Measures in Public Buildings
|
Energy |
Completed |
01 Jan 2012 |
Montenegro |
Construction of Regional Landfills in Plijevlja and Zablijak
|
Environment |
Completed |
01 Apr 2014 |
Montenegro |
Construction of Regional Landfills in Montenegro
|
Environment |
Completed |
01 Apr 2014 |
Serbia |
Interconnection with Bulgaria Gas Transmission Pipeline
|
Energy |
Completed |
01 Oct 2012 |
Serbia |
TA for School Modernisation Programme
|
Social |
Completed |
31 Mar 2016 |
Serbia |
TA for Railways Rehabilitation II
|
Transport |
Completed |
30 Jun 2014 |
Serbia |
TA for Railway Infrastructure
|
Transport |
Completed |
30 Nov 2014 |
Bosnia and Herzegovina |
Wind Farm Poklecani
|
Energy |
Completed |
01 Jan 2014 |
Bosnia and Herzegovina |
Water Leakage Reduction Plan for the Municipality of Tuzla
|
Environment |
Completed |
01 Dec 2013 |
Bosnia and Herzegovina |
Construction of sewage collectors and wastewater treatment & disposal plant in Cazin
|
Environment |
Completed |
30 Jul 2017 |
Bosnia and Herzegovina |
Flood Risk Management for the Republic of Srpska
|
Environment |
Completed |
01 May 2014 |
Bosnia and Herzegovina |
Designing the Medical Faculty, Medical Research Center and Secondary Medical School
|
Social |
Completed |
31 Oct 2013 |
Bosnia and Herzegovina |
Corridor Vc Railways, Track overhaul Bos. Šamac/Šamac – Sarajevo, Sections Doboj – Maglaj, Jelina-Zenica
|
Transport |
Completed |
01 Apr 2014 |
Croatia |
LNG Regasification Vessel
|
Energy |
Completed |
01 Jun 2014 |
Croatia |
LNG Evacuation Gas Pipelines Omišalj - Zlobin - Rupa (Slovenia)
|
Energy |
Completed |
01 Nov 2013 |
Kosovo* |
Feasibility Study for Key Railway Links (East – West)
|
Transport |
Completed |
01 Jan 2013 |
North Macedonia |
National gasification system
|
Energy |
Completed |
19 Jun 2015 |
North Macedonia |
Rail Corridor VIII, Kumanovo - Beljakovce Section: Detailed Design, Tender Documents
|
Transport |
Completed |
31 Dec 2016 |
Bosnia and Herzegovina |
400 kV Interconnection Serbia – Montenegro – BiH - Regional Project
|
Energy |
Completed |
08 Apr 2015 |
Albania |
Regional Project Ionian Adriatic Pipeline
|
Energy |
Completed |
01 May 2014 |
Croatia |
Construction and Development of the Centre for Entrepreneurial Learning and Strengthening Competitiveness Economy (Entrepreneurial Learning)
|
Social |
Completed |
01 Apr 2014 |
Serbia |
Rehabilitation of the District Heating Systems in Serbia – Phase IV” - Program implementation – SECOND STAGE
|
Energy |
Completed |
31 Dec 2016 |
Albania |
Albania – North Macedonia Power Interconnection: Feasibility Study for Elbasan - Fier Overhead Transmission Line
|
Energy |
Completed |
24 Sep 2014 |
Albania |
Feasibility study for construction of sanitary regional landfill - Vlora region
|
Environment |
Completed |
31 Dec 2015 |
Albania |
Master plan & feasibility study for communal infrastructure works in Albanian Alps area
|
Social |
Completed |
31 Dec 2017 |
Bosnia and Herzegovina |
Mostar Water and Sewerage Systems: Project Management, Tender Documents and Procurement Support
|
Environment |
Completed |
30 Sep 2017 |
Bosnia and Herzegovina |
Brčko Bypass: Technical Assistance during Construction
|
Transport |
Completed |
24 May 2016 |
Bosnia and Herzegovina |
Study on Toll Collection and System Design for Republika Srpska Motorways
|
Transport |
Completed |
09 Jul 2013 |
Croatia |
Zadar University New Campus and University Learning Resource Centre: Feasibility Study, Design and Tender Documents, Project Management Support
|
Social |
Completed |
20 Sep 2018 |
Montenegro |
Kolašin Biomass District Heating System: Feasibility Study
|
Energy |
Completed |
24 Sep 2018 |
Montenegro |
Electricity Network Expansion for the Development of New Renewable Energy Sources: Feasibility Study, Preliminary Design, ESIA
|
Energy |
Completed |
21 Apr 2023 |
Montenegro |
Technical assistance for improvement of water supply system in the Old Royal Capital of Cetinje
|
Environment |
Completed |
31 Dec 2017 |
Montenegro |
Preparation of a SEETO road route 4 investment plan for Montenegro
|
Transport |
Completed |
31 Oct 2012 |
Bosnia and Herzegovina |
Bosnia and Herzegovina - Croatia South Gas Interconnection: Pre-feasibility Study
|
Energy |
Completed |
01 Nov 2013 |
Serbia |
Extended TA for Judiciary Facilities
|
Social |
Completed |
01 May 2014 |
Serbia |
Development of a concept for monitoring & evaluation of inclusive practice in Serbian education system
|
Social |
Completed |
30 Jun 2015 |
Serbia |
Belgrade road & tram network upgrade - Phase 2
|
Transport |
Completed |
01 Nov 2019 |
Albania |
Feasibility Study for Tirana Bypass (Kashar - Vaqarr - Mullet)
|
Transport |
Completed |
01 May 2014 |
Bosnia and Herzegovina |
Vlasic-Travnik 50 MW Wind Farm
|
Energy |
Completed |
31 Dec 2016 |
Bosnia and Herzegovina |
Support for vulnerable persons living in collective accommodation
|
Social |
Completed |
12 Mar 2021 |
Bosnia and Herzegovina |
Support for Construction of Integra Cultural and Sports Centre in Mostar
|
Social |
Completed |
01 May 2014 |
Kosovo* |
Energy Efficiency measures in Central Public Buildings
|
Energy |
Completed |
31 Dec 2016 |
Kosovo* |
Strengthening Waste Management
|
Environment |
Completed |
30 Jun 2015 |
Kosovo* |
Feasibility Study for Protection of Iber Canal
|
Environment |
Completed |
30 Apr 2016 |
North Macedonia |
Rail Corridor VIII, Beljakovce - Deve Bair Section: Detailed Design, Tender Documents
|
Transport |
Completed |
29 Jun 2021 |
North Macedonia |
Rail Corridor VIII, Kumanovo - Beljakovce Section: Supervision of Works
|
Transport |
Completed |
31 Dec 2018 |
Montenegro |
Rehabilitation and Construction of Municipal Water and Sanitation Infrastructure: Tender Documents and Procurement Assistance for Investments in Bijelo Polje, Cetinje, Berane, Plav, Ulcinj, and Andrijevica
|
Environment |
Completed |
30 Sep 2018 |
Albania |
Establishment of a Regional Energy Efficiency Programme for the Western Balkans
|
Energy |
Completed |
31 Mar 2023 |
Bosnia and Herzegovina |
Strengthening of main Croatian transmission North-South axis
|
Energy |
Completed |
31 Mar 2019 |
Albania |
Gas to Power Initiative and the Energy Community (EnC) Gas Ring in South East Europe
|
Energy |
Completed |
30 Jun 2018 |
Albania |
PPP Institutional Strengthening in the Western Balkans
|
PrivateSectorDevelopment |
Completed |
31 Oct 2014 |
Albania |
Pilot Project for Higher and Professional Education Finance in Southeast Europe
|
Social |
Completed |
31 Dec 2014 |
Albania |
Updating the Regional Transport Study (REBIS)
|
Transport |
Completed |
30 Jun 2015 |
Bosnia and Herzegovina |
Smart Metering / Automated Meter Reading (AMR) System: Feasibility Study
|
Energy |
Completed |
06 Mar 2015 |
Bosnia and Herzegovina |
Water and Sanitation Project in Republika Srpska
|
Environment |
Completed |
01 Mar 2015 |
Croatia |
Sava River Regulation and Development: Feasibility Study, including Conceptual Design and Strategic Environmental Impact Assessment
|
Energy |
Completed |
31 Mar 2019 |
Kosovo* |
Feasibility Study - Fuel Switching and System Expansion for District Heating in Gjakova
|
Energy |
Completed |
01 Feb 2014 |
Kosovo* |
Kosovo education improvement project
|
Social |
Completed |
31 Dec 2015 |
Bosnia and Herzegovina |
Support to water resources management in Drina River Basin
|
Environment |
Completed |
30 Nov 2015 |
Serbia |
EE Programme in public buildings – Serbia EEP
|
Energy |
Active |
31 Jan 2027 |
Serbia |
Extended TA for Improvement of Prison Facilities
|
Social |
Completed |
01 Mar 2015 |
Serbia |
Orient/East-Med (CX) Corridor: Feasibility Study for Reconstruction and Modernisation of Stalać – Djunis Section on Belgrade – Niš Railway Line
|
Transport |
Completed |
31 Oct 2018 |
Bosnia and Herzegovina |
HHP Babino selo
|
Energy |
Completed |
31 Jul 2019 |
Bosnia and Herzegovina |
WATSAN Programme in the Federation of Bosnia and Herzegovina: Programme Management Support
|
Environment |
Completed |
24 Nov 2017 |
Croatia |
Zadar Uni: new campus & Learning Resource Centre
|
Social |
Completed |
31 Dec 2021 |
Kosovo* |
Railway Route 10 Rehabilitation: Fushe Kosove – Hani i Elezit Section
|
Transport |
Completed |
31 Dec 2019 |
North Macedonia |
400kV Interconnection Bitola (North Macedonia) - Elbasan (Albania) Line and Substation
|
Energy |
Completed |
28 Feb 2019 |
North Macedonia |
Motorway A4 Skopje - Blace: Stenkovec Interchange - Blace Section
|
Transport |
Completed |
16 Jul 2023 |
Albania |
Sector Study on Biomass-based Heating in the Western Balkans
|
Energy |
Completed |
30 Jun 2018 |
Bosnia and Herzegovina |
Study for Establishment of the Protection Zones of a “Klokot” Source (Bihać) Intersected by Interstate Boundaries
|
Environment |
Completed |
30 Dec 2020 |
Albania |
Higher and Professional Education Finance in Southeast Europe - pilot project
|
Social |
Completed |
31 Dec 2015 |
Serbia |
Central Balkan Corridor: Feasibility Study for 400 kV Bajina Basta – Kraljevo Overhead Transmission Line
|
Energy |
Completed |
26 Apr 2018 |
Serbia |
Palace of Justice
|
Social |
Completed |
30 Nov 2019 |
Albania |
Electrification of Durres – Tirana PTT – Tirana CCS Railway Line and Link to Tirana Airport
|
Transport |
Active |
12 Jul 2024 |
Kosovo* |
Assessment of the alternatives to deliver utility-scale dispatchable renewable power to Kosovo
|
Energy |
Completed |
28 Mar 2024 |
Montenegro |
Bar - Boljare Highway: Road Safety Audits for Podgorica Bypass and Mateševo - Andrijevica Section
|
Transport |
Completed |
16 May 2023 |
Albania |
A Regional Strategy for Sustainable Hydropower in the Western Balkans
|
Energy |
Completed |
19 Dec 2018 |
Albania |
Regional Study on Renewable Energy Potential and Energy Efficiency in the Western Balkans
|
Energy |
Completed |
28 Feb 2020 |
Albania |
Gap Analysis and Needs Assessment in the Context of Implementing EU Floods Directive in the Western Balkans
|
Environment |
Completed |
24 Sep 2015 |
Bosnia and Herzegovina |
Regional Housing Programme on Durable Solutions for Refugees and Displaced Persons (RHP)
|
Social |
Completed |
30 Jun 2012 |
Albania |
Regional Connectivity Networks Gap Analysis
|
Transport |
Completed |
28 Apr 2017 |
Albania |
Update of the Connectivity Network Gap Analysis
|
Transport |
Completed |
29 Mar 2020 |